Sorry for my latent blog. I had hopes to make this a 4-post project, but that isn’t possible due to my recent adventures exploring my other passion- plumbing…(not). After two weeks of work (nights and weekends) that included five days without running water, $360 to a plumber that did not help at all, 4-5 trips to Lowe’s, dozens of phone calls, and two trips to Brevard County to obtain the extremely rare parts needed to fix a 1hp Sta-Rite ProJet pump. And after taking said pump apart twice; we now have running water. We are still troubleshooting the lack of pressure in the system and still need to install final changes to the wellhead, but I was finally able to get back to the Plympton house and paint.
As a compensatory bone, I am throwing in these two pictures of the bridge in progress: (and yes, it appears that the bridge leads to a void, but I will fix that – I promise)
One Response to Plympton Mural, Part 4… The Bridge to Nowhere